The project included design and construction of pavement rehabilitation on Sir Francis Drake Boulevard between the Hub and Bolinas Avenue, along with bicycle and pedestrian improvements in accordance with the Town’s Complete Streets Policy. The federally-funded grant from One Bay Area Grant 2 program (OBAG 2) provided funding through Metropolitan Transportation Commission (MTC) and Transportation Authority of Marin (TAM) for $1,134,000 with a local match of $250,000 for the project.
Construction was completed in 2022